Sketchup model of the "as-is" tub and surroundings, as I start getting ready to design the new structure.
All cleaned up and ready for re-assembly
Siding installed and caulked, ready for paint.
Almost ready for the trip home
Ready for final finishing with Rubio monocoat
Ready to start setting tile
Raw materials, ready to be transformed.
A bunch o' parts, labeled and ready for assembly
Getting ready to assemble
Bench legs assembled, ready for plugs
Benches ready for their seat tops
Table ready for it's top
Getting ready for the top
Getting ready to install table top
Bench ready for sanding and finish
Two benches, ready for delivery
Windowsill tiles laid out ready to install
Everything laid out, ready to stick it on the wall
This area is ready for grout
All the tiles installed, almost ready for grout
Top, ready to install.
Bottom, ready to deliver and install
All swept, ready for cleaning.
ready for scrubbing
Ready to start the transfer process.
Plaster added - almost ready to fill!