First test of new skirt and new drip edge
First coat of paint.
After delivering the first one (which implies there was a second one), I discovered that my measurements were wrong. The space for the vivariums were supposed to be 24" tall each, not 18" tall each.
First parts made and labeled.
First sheet of tile installed
First cabinet assembled and in place
First wall assembled!
First step is to wet it and scrub with a broom.
First stone set.
prototype of the first bay
First several bays assembled - but needs re-work
First several bays assembled. Re working for better surface finish and better color.
First tiles being adhered to the wall!