Here, some damage to the corner trim (1x4), the bottom drip edge (special profile) and the bottom skirt (1x12)
Pretty extensive damage here.
More damage at the same corner.
This door has some pretty bad damage.
Another view showing drip edge damage all along here.
Surveying the damage after removing the 1x4 trim
This damage went pretty deep - even into the structural plywood beam.
Damage removal at the other corner
The damage
Details of the damage - the doggo did quite a number on it.
Some water damage in this eave
Wider view of water damage
Critter/water damage at the corner. Main task.
detail of insect damage
Before - water damage